首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Chevron starts FEED push at Gendalo-Gehem
【24h】

Chevron starts FEED push at Gendalo-Gehem

机译:雪佛龙开始在Gendalo-Gehem进行FEED推广

获取原文
获取原文并翻译 | 示例
       

摘要

CHEVRON has started the process of identifying contractors for the next phase of its Indonesia Deep-water Development (IDD) project as it awaits approval of a revised plan of development. Sources said the US supermajor has issued a market assessment to identify contractors with engineering, procurement, construction and installation expertise capable of, and interested in, bidding for the next phase of work. The next phase is front-end engineering and design, and sources said Chevron is still finalising its contracting strategy for how to deliver the project's production facilities.
机译:雪佛龙公司正在等待其修订的发展计划的批准,开始为其印尼深水开发(IDD)项目的下一阶段确定承包商。消息人士称,这家美国超级巨头已经发布了一份市场评估报告,以确定具有工程,采购,建筑和安装专业知识的承包商,这些承包商有能力并且有兴趣对下一阶段的工作进行招标。下一阶段是前端工程和设计,消息人士称雪佛龙公司仍在敲定其合同战略,以交付该项目的生产设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号