首页> 外文期刊>Underground construction >Construction Quality Assurance, Quality Control For Trenchless Technologies
【24h】

Construction Quality Assurance, Quality Control For Trenchless Technologies

机译:施工质量保证,非开挖技术的质量控制

获取原文
获取原文并翻译 | 示例
       

摘要

According to the Environmental Protection Agency (EPA), $11.6 billion in funding is required annually to sustain required sewer renovation in the United States. Underground Construction magazine estimates that actual spending will be closer to $3.5 billion. This represents a significant shortfall of current spending that will need to be made up in the future. The "pay me now or pay me later" scenario becomes obvious. Half of the over 20 million existing manholes and 72 million sewer laterals also need some rehabilitation which will add another one billion dollars annually to potential expenditures. The EPA now estimates that the nation must spend $390 billion over the next 20 years to replace existing, deteriorating wastewater systems and to meet increasing demands.
机译:根据环境保护署(EPA)的数据,每年需要116亿美元的资金来维持美国所需的下水道翻新工程。 《地下建筑》杂志估计,实际支出将接近35亿美元。这表示未来需要弥补的当前支出的巨大缺口。 “现在付款或以后付款”的情况变得很明显。现有的超过2000万个沙井和7200万个下水道分支中的一半也需要进行修复,这将使每年的潜在支出再增加10亿美元。 EPA现在估计,美国在未来20年内必须花费3900亿美元来替换现有的,日益恶化的废水系统,并满足日益增长的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号