...
首页> 外文期刊>Tunnels & tunnelling international >Prequal list for Seattle deep bore
【24h】

Prequal list for Seattle deep bore

机译:西雅图深口径资格预赛清单

获取原文
获取原文并翻译 | 示例
           

摘要

All four JVs have been pre-qualified from those seeking to bid for the deep, single bore tunnel to be built at the waterfront in Seattle on the SR99 highway route. The design-build JVs that have been pre-qualified to build the tunnel, the route of which has been modified, are:rn1. WV JV - Kiewit Pacific, Bilfinger Berger and AECOM;rn2. Seattle Tunnel Partners -Dragados and HNTB Corp;rn3. Seattle Tunnelling Group - S.A. Healy, FCC Construcoion, Parsons Transportation Group and Halcrow;rn4. VTS JV - Vinci Construction Grand Projets, Traylor Bros, Skanska and Arup.
机译:所有四家合资企业均已通过资格竞标,以寻求竞标在SR99高速公路沿西雅图海滨建造的深层单孔隧道。已通过资格预审以建造隧道且已修改其路线的设计建造合资企业为:rn1。 WV合资公司-Kiewit Pacific,Bilfinger Berger和AECOM; rn2。 Seattle Tunnel Partners -Dragados和HNTB Corp; rn3。西雅图隧道集团-S.A. Healy,FCC Construcoion,帕森斯运输集团和Halcrow; rn4。 VTS合资企业-Vinci Construction Grand Projets,Traylor Bros,Skanska和Arup。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号