Analysis of the displacement increment induced by removing temporary linings and corresponding countermeasures

机译:拆除临时衬砌引起的位移增量分析及对策

获取原文
获取原文并翻译 | 示例
       

摘要

Temporary shotcrete lining plays an important role in stabilizing tunnel structures. However, demolition of the temporary lining has negative impacts on the preliminary lining. Based on a case study of using pre-tensioned anchor cables to minimize the risk caused by removing temporary linings, a comprehensive study has been carried out on the displacement caused by removing temporary linings as well as countermeasures. A calculation model was established based on a bedded-beam model recommended by the International Tunneling Association (ITA). Using this model, the influences of three factors, the axial force in the temporary lining, the thickness of the preliminary lining and the deformation modulus of the ground, were studied in detail. Countermeasures were proposed corresponding to each of the influence factors and a countermeasure grading system was constructed. The research results presented in this paper can be valuable references for design and construction of tunnels involving use of temporary linings.
机译:临时喷射混凝土衬砌在稳定隧道结构中起着重要作用。但是,拆除临时衬砌会对初步衬砌产生负面影响。在以使用预张紧的锚索使拆除临时衬砌引起的风险最小化的案例研究为基础,对拆除临时衬砌引起的位移以及对策进行了综合研究。基于国际隧道协会(ITA)推荐的层状梁模型,建立了计算模型。使用该模型,详细研究了临时衬砌的轴向力,初步衬砌的厚度和地面变形模量这三个因素的影响。针对每种影响因素,提出了相应的对策,并建立了对策分级体系。本文提出的研究成果可为涉及临时衬砌的隧道设计和施工提供有价值的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号