首页> 外文期刊>Transportmetrica >Emergency supply chain scheduling problem with multiple resources in disaster relief operations
【24h】

Emergency supply chain scheduling problem with multiple resources in disaster relief operations

机译:灾难救济操作中多资源的应急供应链调度问题

获取原文
获取原文并翻译 | 示例
       

摘要

In emergency logistics, it is important to allocate available assets to operations effectively due to the resource scarcity. This paper considers a supply chain network which includes local and global suppliers of medical relief items, regional and central distribution centers, and many customer demand points. Either pre-positioned resources at distribution centers or new assembly operations at them can fulfill resources demands. Moreover, a capacitated multi-stage operations scheduling problem is presented, in which renewable (medical teams) as well as non-renewable resources (standard or customized medical kits) are required in an emergency supply chain. In addition, a new mixed-integer programming model is presented and solved for small-sized problems. Further, for solving large-sized problems, a particle swarm optimization algorithm is developed. Finally, the performance of the proposed solution method is evaluated, and some sensitivity analyses are conducted on the more important parameters.
机译:在紧急物流中,由于资源稀缺,重要的是将可用资产分配到运营。本文考虑了供应链网络,包括医疗救济物品,区域和中央配送中心的本地和全球供应商,以及许多客户需求点。在分发中心或其新装配操作的预先定位资源可以满足资源需求。此外,介绍了电容多级操作调度问题,其中在紧急供应链中需要可再生(医疗团队)以及不可再生资源(标准或定制的医疗套件)。此外,还提出了一种新的混合整数编程模型,并解决了小型问题。此外,为了解决大型问题,开发了一种粒子群优化算法。最后,评估所提出的解决方案方法的性能,对更重要的参数进行一些敏感性分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号