...
首页> 外文期刊>Transactions of Tianjin University >Integrated Control Model for Time and Cost Risk in Project Management
【24h】

Integrated Control Model for Time and Cost Risk in Project Management

机译:项目管理中时间和成本风险的集成控制模型

获取原文
获取原文并翻译 | 示例

摘要

Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems as the delay of schedule by reason of the impracticability of cash flow, the money difficulties caused by delay of schedule and so on. In order to control and manage the time and cost risk effectively and simultaneous- ly, a time & cost risk control model based on schedule programme was established with the use of the quantita- tive models of BCWS, BCWP and ACWP I this paper.
机译:时间,成本和质量是项目管理中要控制的三个主要目标。然而,时间和成本风险的控制和管理通常是分别进行的,由于现金流量的不实用性,会导致进度延误,进度延误造成资金困难等问题。为了有效并同时地控制和管理时间和成本风险,本文利用BCWS,BCWP和ACWP I的定量模型,建立了基于进度计划的时间和成本风险控制模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号