首页> 外文期刊>Railway magazine >Southall Open Days On 'new' Site
【24h】

Southall Open Days On 'new' Site

机译:索撒尔开放日在“新”网站上

获取原文
获取原文并翻译 | 示例
       

摘要

The Great Western Railway Preservation Group (GWRPG) hopes to start a 2009 series of open days, possibly in August.rnThe group's lease for revised land encompassing three sidings on the south side of the site (RM Feb) should soon be finalised. Although suitable for stock storage, these lines require upgrading before they can be used for public rides.rnThe overhaul of RSH 0-4-0ST Birkenhead is almost complete. The boiler has been hydraulically tested and is back in the frames with a steam test anticipated by the end of March. Peckett 0-4-0ST William Murdoch is also available for use. One of these locos will be available for hire to another railway this season. With upgrading of the track so that the GWRPG can re-open the Southall site to the public being its top priority, a special celebration of the 150th anniversary of the adjacent freight-only Brentford branch now looks unlikely.
机译:大西部铁路保护集团(GWRPG)希望在2009年的开放日开始,可能在8月开始。rn该集团对包含该站点南侧的三块墙板的土地的修订土地租赁(2月RM)应尽快完成。尽管这些线路适合存储库存,但在进行公共乘车之前,需要对其进行升级。rnRSH 0-4-0ST Birkenhead的检修工作已接近完成。锅炉已经过水压测试,并在3月底前进行了蒸汽测试。也可以使用Peckett 0-4-0ST William Murdoch。这些机车之一将在本季租用到另一条铁路。随着赛道的升级,使GWRPG可以重新向公众开放Southall场馆,这是当务之急,现在看来不太可能庆祝毗邻的仅货运的Brentford分店成立150周年。

著录项

  • 来源
    《Railway magazine》 |2009年第1297期|61-61|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:33:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号