【24h】

WORKSHOP NEWS

机译:车间新闻

获取原文
获取原文并翻译 | 示例
           

摘要

PREPARATIONS are being made to lift the cab and boiler from the Erlestoke Manor Fund's Severn Valley Railway-based No. 7802 Bradley Manor. The frames and wheels will be sent to Tyseley Locomotive Works for overhaul with completion expected by late spring 2012. EMF is also building a replacement Churchward 3,500 gallon tender for No. 7802. A redundant tender chassis (No. 2329) has been purchased from Llangollen to provide components, although the frames and wheelsets will not be utilised for the new tender. Dinmore Manor overhaul progress THE contracted overhaul of the frames of Dinmore Manor Locomotive Limited's No. 7820 Dinmore Manor at Tyseley is almost complete. The trailing wheelset has returned to Tyseley following work at the South Devon Railway's Buckfastleigh workshops and the wheelsets, with repaired axleboxes, are ready to be put back under the frames. The valves have been re-bored and are ready for fitting The boiler is receiving attention at Ian Riley's Bury works where newly formed doorplate and throatplate parts will be fitted, work likely to be completed in mid-2012.
机译:正在准备从Erlestoke庄园基金会位于塞文谷铁路的7802 Bradley Manor吊起驾驶室和锅炉。车架和车轮将被送往Tyseley机车厂进行检修,预计于2012年春末完成。EMF还在为7802号建造一个替换的Churchward 3,500加仑标书。已从兰戈伦购买了一个多余的标底盘(2329号)。提供组件,尽管框架和轮对将不会用于新招标。丁莫尔庄园大修进展丁莫尔庄园机车有限公司位于蒂瑟利的7820号丁莫尔庄园的框架大修工作已接近完成。在南德文郡铁路公司的Buckfastleigh车间进行工作后,后轮对已返回Tyseley,带有已修复轴箱的轮对已准备好放回车架下方。阀门已重新钻孔,可以安装。锅炉在Ian Riley的Bury工厂中受到关注,该工厂将安装新形成的门板和喉板部件,该工作有望在2012年中期完成。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1328期|p.66|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号