首页> 外文期刊>The Railway Magazine >Looking good for loco turning on Norton Fitzwarren triangle
【24h】

Looking good for loco turning on Norton Fitzwarren triangle

机译:看起来很不错,可以打开Norton Fitzwarren三角形

获取原文
获取原文并翻译 | 示例
           

摘要

The West Somerset Railway anticipates turning locomotives on its Norton Fitzwarren triangle from early 2012. Commissioning of the triangle is expected during January, on receipt of a licence exemption from the Office of Rail Regulation (ORR). Its principal use is likely to be the turning of locomotives arriving with tours off the main line. Around 125 metres of rail were delivered on November 23 to complete and lengthen the Allerford spur to the long-demolished Allerford bridge. A delivery of flat-bottom rail for the East chord, to complete the inner triangle, was expected around the beginning of December.
机译:西萨默塞特铁路公司预计其Norton Fitzwarren三角铁路的机车将从2012年初开始转弯。预计该三角铁路的机车将在1月获得铁路管理办公室(ORR)的许可免运。它的主要用途可能是将机车从主要路线上移开而转向。 11月23日交付了约125米的铁路,以完成并延长已拆除的Allerford桥的Allerford支线。预计在12月初左右交付用于东弦的平底导轨,以完成内部三角形。

著录项

  • 来源
    《The Railway Magazine》 |2012年第1330期|p.62|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号