首页> 外文期刊>The Railway Magazine >Commissioning of run-round loop at Blaenavon ends P&BRtop-and-tails
【24h】

Commissioning of run-round loop at Blaenavon ends P&BRtop-and-tails

机译:Blaenavon的循环循环的调试结束了P&BRtop-and-tails

获取原文
获取原文并翻译 | 示例
       

摘要

The Pontypool & Blaenavon Railway commissioned the run-round loop at Blaenavon (High Level) in time for late-May bank holiday operations. The loop significantly alters the way the line can be worked, since a run-round at Blaenavon eliminates the need for top-and tail working to and from this station. The loco runs round again at Furnace Sidings to propel the train up the steep gradient to Whistle Inn. On special event days, a second loco (steam or diesel) works the Big Pit branch; on 'ordinary'operating dates one loco and train can handle branch and main line working.
机译:庞蒂浦和布拉纳文铁路公司在5月下旬的银行假日运营期间,在布拉纳文(高层)试运行了环行列车。该环路大大改变了生产线的工作方式,因为在Blaenavon进行的一次巡回检查消除了往返于该工位的上下作业的需要。机车在Furnace Sidings再次绕行,将火车沿陡峭的坡道推向Whistle Inn。在特殊活动日,第二个机车(蒸汽或柴油)在Big Pit分支工作;在“正常”运行日期,一辆机车和火车可以处理分支和干线工作。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1348期|70-70|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:29:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号