首页> 外文期刊>The Railway Magazine >Chiltern raises loco-hauled diagrams to five
【24h】

Chiltern raises loco-hauled diagrams to five

机译:Chiltern将机车牵引图提高到五个

获取原文
获取原文并翻译 | 示例
       

摘要

A change to the summer timetable has seen Chiltern Railways increase the number of its weekday loco-hauled diagrams to five. Three of the diagrams involve services from either Stourbridge Junction, Birmingham Moor Street or Snow Hill to Marylebone, while the other two are an early morning Kidderminster to Marylebone and evening return service, and a similar duty from Banbury to Marylebone. Chiltern has four refurbished six-car Mk 3 rakes which work with a DVT on the West Midland services, while an unrefurbished Mk 3 set is used on the Banbury diagram.
机译:更改了夏季时间表后,Chiltern Railways将其平日的机车牵引图数量增加到了5张。其中三幅图涉及从斯托布里奇交界处,伯明翰高地街或雪山到马里波恩的服务,另外两幅图则是从基德明斯特到马里波恩的清晨和夜间返回服务,以及从班伯里到马里波恩的类似职责。 Chiltern拥有4辆翻新的6辆Mk 3耙,可在西米德兰(West Midland)上与DVT配合使用,而Banbury图上则使用了未翻新的Mk 3套装。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1348期|81-81|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:29:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号