首页> 外文期刊>The Railway Magazine >Extended Telford tram line for 2015
【24h】

Extended Telford tram line for 2015

机译:2015年延长的Telford电车线

获取原文
获取原文并翻译 | 示例
       

摘要

Extension of the 2ft-gauge line at the Telford Steam Railway's Spring Village HQ into a complete circle has been completed. The line is worked by a vertical-boilered steam tram -built circa 1977 by Alan Keef Ltd for the Telford Development Corporation - which has been at Spring Village for 22 years. During 2014, the tram continued to use the old horseshoe-shaped track, as the turnout to the new full circuit was clamped out of use, but the full circuit was employed for passenger services for the first time during the TSR's 'Santa' operations and will be in full use during 2015. Its official opening will probably be held simultaneously with the opening of the TSR's standard gauge Lawley extension. Narrow gauge equipment at the site now also includes Ruston 30DL 339209/1952 and Ruston Hornsby 20DC 222101/1944.
机译:Telford蒸汽铁路的Spring Village总部的2英尺规线已扩展到一个完整的圆。该生产线由一台垂直沸腾的蒸汽电车工作,该电车由艾伦·基夫有限公司(Alan Keef Ltd)于1977年为Telford Development Corporation建造,该公司已经在Spring Village运营了22年。 2014年,有轨电车继续使用旧的马蹄形轨道,原因是新全线道的岔道被禁止使用,但在TSR的“圣诞老人”运营期间,全线道首次用于乘客服务,将于2015年全面使用。它的正式启用可能会与TSR的标准规格Lawley扩展名同时启用。现在,该站点的窄轨设备还包括Ruston 30DL 339209/1952和Ruston Hornsby 20DC 222101/1944。

著录项

  • 来源
    《The Railway Magazine》 |2015年第1367期|94-94|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:26:59

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号