首页> 外文期刊>The NEWEA journal >Installation of screw press for solids dewatering at the Westerly Wastewater Treatment Plant
【24h】

Installation of screw press for solids dewatering at the Westerly Wastewater Treatment Plant

机译:在Westerly废水处理厂安装螺旋压榨机进行固体脱水

获取原文
获取原文并翻译 | 示例
           

摘要

Before 2018, the town of Westerly, Rhode Island, disposed of sludge generated at the wastewater treatment plant (WWTP) and septage received there as liquid sludge. The process required three to four trucks per day, something time-consuming for the plant operators, expensive, and disruptive to the surrounding roads and community. The town evaluated several alternatives for installation of a dewatering process to alleviate the issues with the disposal process. A screw press was selected as the preferred technology. Pilot- and bench-scale testing provided the necessary information to size the equipment and design the process. Construction began in May 2018, and the WWTP was processing sludge by October 2018. The project reduced disposal costs and truck traffic, and allowed operators to spend more time on other parts of the WWTP.
机译:在2018年之前,罗得岛州的韦斯特里镇处理掉了废水处理厂(WWTP)产生的污泥,并在那里收集了污泥作为液态污泥。该过程每天需要三到四辆卡车,这对于工厂运营商来说是很费时的,而且昂贵并且对周围的道路和社区造成破坏。该镇评估了安装脱水过程的几种替代方案,以减轻处置过程中的问题。选择了螺旋压榨机作为首选技术。中试规模和试验规模的测试提供了必要的信息,以调整设备的尺寸并设计过程。工程于2018年5月开始,污水处理厂在2018年10月之前处理污泥。该项目降低了处置成本和卡车运输量,并允许运营商将更多时间花在污水处理厂的其他部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号