首页> 外文期刊>The Naval Architect >Daegu development stalls as STX Enpaco feels the pinch
【24h】

Daegu development stalls as STX Enpaco feels the pinch

机译:STX Enpaco感到压力,大邱开发停滞

获取原文
获取原文并翻译 | 示例
           

摘要

Funding shortfall postpones building of major element of the STX Enpaco factory even though the rest of the plant opened for business earlier this year.rnBuilding work at STX Enpaco's new plant in Daegu has stopped before the precision casting plant has been built as the economic recession takes a hit at another Korean major.rnThe Daegu development will build turbochargers and other precision machinery and parts for the shipbuilding industry, though Wan - Seok Kim, assistant manager of the STX Enpaco's business team in Gyeongsangnam-do, near Busan, admits that 90% of the company's business is conducted with its sister organisation that builds ships, STX Shipbuilding.
机译:即使其余工厂于今年早些时候开始营业,资金短缺也推迟了STX Enpaco工厂主要部件的建设。rn随着经济衰退的到来,STX Enpaco在大邱的新工厂的建设工作已经停止。尽管在釜山附近庆尚南道的STX Enpaco业务团队的助理经理Wan-Seok Kim承认,大邱的开发项目将为造船业制造涡轮增压器和其他精密机械及零件。该公司的业务是与姊妹组织STX Shipbuilding进行的。

著录项

  • 来源
    《The Naval Architect》 |2009年第10期|54|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号