首页> 外文期刊>The Naval Architect >Canada plans interim solution to loss of replenishment vessels
【24h】

Canada plans interim solution to loss of replenishment vessels

机译:加拿大计划对补给船的损失采取临时解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

The Royal Canadian Navy has found itself with a difficult situation to manage due to the earlier than anticipated withdrawal from service of its Protecteur-class replenishment vessels. It is already in the midst of the most intensive and comprehensive period of fleet modernisation and renewal in its peacetime history, a process that is touching on all elements of its fleet. This period of transition includes the modernisation of its 12 Halifax-class frigates, the retirement of the two Protecteur-class replenishment ships and two Iroquois-class destroyers and the procurement of three new classes of ships: the Joint Support Ships (JSS); the Arctic/Offshore Patrol Ships; and the new Canadian Surface Combatants, as well as the integration of new maritime helicopters into fleet service.
机译:加拿大皇家海军发现自己的处境困难,因为其保护者级补给舰退役比预期提前。在和平时期,它已经处于舰队现代化和更新最密集,最全面的时期,这一过程触及到舰队的所有要素。这一过渡期包括对其12艘哈利法克斯级护卫舰进行现代化改造,两艘保护者级补给船和两艘易洛魁级驱逐舰的退役,以及三艘新船的采购:联合支持船(JSS);北极/近海巡逻舰;以及新的加拿大水面战斗机,以及将新的海上直升机纳入舰队服役。

著录项

  • 来源
    《The Naval Architect》 |2015年第julaaaugaappa期|5-5|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号