Houston's new $324 million METRORail opened Jan. 1 this year, and was greeted with jubilant celebration. A hybrid project delivery vehicle that telescoped both design and construction, from preliminary engineering to delivery, in some three years, meant it was available for this year's Super Bowl. An entire year's work on the 7.5-mi, 16-station light rail line system was shaved off the original schedule; it was a virtual "two-minute drill." To meet the deadlines of this project, our company created a unique construction-driven project delivery process that closely resembled the "just-in-time" protocols of manufacturing supply systems.
机译:休斯顿新的3.24亿美元的METRORail铁路于今年1月1日开业,并受到了热烈的庆祝。混合动力项目交付工具在大约三年的时间内涵盖了从初步工程设计到交付的设计和施工,这意味着它可用于今年的超级碗。 7.5英里,16站轻轨线系统的全年工作被削减了原定的时间表;这实际上是一次“两分钟的练习”。为了按期完成该项目,我们公司创建了一个独特的,由施工驱动的项目交付流程,该流程非常类似于制造供应系统的“及时”协议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号