The north east waste management region issued its first waste management plan in 2000, which sought thermal treatment capacity. The first planning application for the Meath facility was submitted in November 2000, which was approved in March 2003 following appeals to An Bord Pleanala and an oral hearing. A waste licence application was submitted in parallel, in December 2001. This took considerably tonger and involved extensive consultation on how to treat the facility (as a waste facility or a production facility), modifications to existing legislation, and an oral hearing before the licence was granted in November 2005.By this time, the regional waste management plan had been reviewed and called for a larger facility to cope with the region's waste. The design was, therefore, revised to provide an extra 50,000t capacity and to include a number of technology improvements. A new planning application was submitted in February 2006. This was approved by June 2007, again following appeals to An Bord Pleanala and another oral hearing. The waste licence was subsequently reviewed in 2008 to include these changes for which a final decision was made in 2011. Finally, minor planning amendments were sought in 2009 to cater for detailed design changes, which made the building smaller in footprint. In the background to all of this, a judicial review was initiated by opposition groups to the project in February 2002, which went to the Supreme Court where the planning decision was upheld in May 2007. Overall, this made the Meath waste-to-energy plant one of the most scrutinised facilities ever to go through the planning and licensing system.
机译:东北废物管理区于2000年发布了第一个废物管理计划,该计划寻求热处理能力。 Meath设施的第一份规划申请已于2000年11月提交,在向An Bord Pleanala上诉并举行了口头听证会之后,该计划于2003年3月获得批准。在2001年12月同时提交了废物许可证申请。这花费了很多时间,涉及到关于如何处理该设施(作为废物设施或生产设施),修改现有法律以及在获得许可证之前进行口头听证的广泛咨询。该计划于2005年11月获得批准。这次,该地区废物管理计划已经过审核,并呼吁建立更大的设施来应对该地区的废物。因此,对该设计进行了修改,以提供额外的50,000吨产能,并包括多项技术改进。 2006年2月提交了新的规划申请。在向An Bord Pleanala上诉并再次举行口头听证会之后,该申请又于2007年6月获得批准。随后,在2008年对废物许可证进行了审查,以包括这些变更,并在2011年做出了最终决定。最后,在2009年寻求对规划进行细微修改,以适应详细的设计变更,从而使建筑物的占地面积更小。在所有这些情况的背景下,反对派团体于2002年2月对该项目进行了司法审查,该审查已提交最高法院,该法院于2007年5月维持了该计划的决定。总体而言,这使米斯变废为宝工厂是有史以来受审查最严格的设施之一,需要经过规划和许可系统。

著录项

  • 来源
    《The engineers journal》 |2011年第5期|p.313|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号