首页> 外文期刊>The architects' journal >Masterplan of the Year North West Cambridge Development by AECOM
【24h】

Masterplan of the Year North West Cambridge Development by AECOM

机译:AECOM年度西北剑桥发展总体规划

获取原文
获取原文并翻译 | 示例
       

摘要

The judges who visited what has already been completed of the Northwest Cambridge Development (Phase 1 is almost finished) were left feel ing incredibly optimistic about the phases to follow,One judge commented that the scheme's current occupation by Cambridge University brings a 'Utopian oasis feel to what appears to be a new town modelled on a graduate campus' but stressed that this has resulted not in a cloistered environment but an urban one, which already has a primary school-'award-winning in its own right'-as its focal point.
机译:参观西北剑桥开发区已经完成(第一阶段已接近完成)的法官对接下来的阶段感到非常乐观。一位法官评论说,剑桥大学对该计划的当前职业带来了“乌托邦式的绿洲感觉”似乎仿照一个以研究生校园为原型的新城镇”,但强调说,这并非导致封闭的环境,而是导致城市环境,该城市已经拥有一所小学,“凭自己的能力赢得了荣誉”,是其重点。点。

著录项

  • 来源
    《The architects' journal》 |2017年第23期|90-91|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 05:15:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号