首页> 外文期刊>Telecom A.M >AIR-SAFETY, RADIATION OBJECTIONS ADDED TO TOWER DEADLINE OPPOSITION
【24h】

AIR-SAFETY, RADIATION OBJECTIONS ADDED TO TOWER DEADLINE OPPOSITION

机译:逾期未交纳的航空安全,辐射障碍

获取原文
获取外文期刊封面目录资料

摘要

The National Association of State Aviation Officials said the FCC should reject the CTIA's request to put deadlines on state and municipality action on applications for cell tower and wireless facility siting. The association said changes could reduce aviation safety. The Electromagnetic Radiation Policy Institute and many city and state organizations also asked the FCC to reject the CTIA's petition, which is supported by the American Legislative Exchange Council, Alltel and a few others in the wireless industry. The deadlines that the CTIA seeks are "irrational, unreasonable, arbitrary and capricious, and unconstitutional," the institute said. It said radiation risks from wireless facilities means siting applications should be studied more not less.
机译:美国国家航空官员协会说,FCC应该拒绝CTIA的要求,即在州和市政府对蜂窝塔和无线设施选址的申请采取最后期限之前提出要求。该协会表示,变化可能会降低航空安全。电磁辐射政策研究所以及许多城市和州组织也要求FCC拒绝CTIA的请愿书,该申请得到了美国立法交流委员会,Alltel和无线行业中其他一些人的支持。该协会说,CTIA寻求的截止日期是“不合理,不合理,任意和反复无常,违反宪法的”。它说,无线设施带来的辐射风险意味着对选址应用的研究应更多​​,而不是更少。

著录项

  • 来源
    《Telecom A.M》 |2008年第190期|P.1-1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号