首页> 外文期刊>Taunton's fine homebuilding >Help with failing exterior finishes
【24h】

Help with failing exterior finishes

机译:帮助外观不合格

获取原文
获取原文并翻译 | 示例
       

摘要

QMy house has a metal roof. The metal is good, but there's a lot of surface rust. I've had it painted twice in the past 30 years, most recently about six years ago. I think the painters sprayed on an oil-based paint. It looked good for a while, but now there's a lot of rust coming through. Do you have any suggestions? A Contributing writer Scott Gibson replies: The paint could be failing for one of several reasons: sloppy prep work, the wrong product, or improper application. Unless there are other problems, however, it will be more economical to have the roof painted a third time than to replace it. That's what I gathered from talking with several experts, including Todd Miller, president of Classic Metal Roofing Systems and a founder of the Metal Roofing Alliance, a trade group for the residential metal-roofing industry. According to Miller, a repainted roof should last as long as 20 years.
机译:问:我的房子有金属屋顶。金属很好,但表面生锈很多。在过去的30年中,我曾两次对其进行过绘画,最近一次是在六年前。我认为画家在油性涂料上喷涂过。看起来好一阵子了,但是现在有很多锈蚀了。你有什么建议吗?一位撰稿人斯科特·吉布森(Scott Gibson)回答:油漆可能由于以下原因之一而失败:草率的准备工作,错误的产品或不正确的应用。但是,除非有其他问题,否则第三次对屋顶进行涂漆比更换它会更经济。我就是从与几位专家交谈的过程中收集到的,这些专家包括Classic Metal Roofing Systems总裁Todd Miller,以及住宅金属屋顶行业的贸易组织Metal Roofing Alliance的创始人。根据米勒的说法,重新粉刷的屋顶应可持续长达20年。

著录项

  • 来源
    《Taunton's fine homebuilding》 |2011年第217期|p.7880|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号