Feasibility study of the small scale LNG plant infrastructure for gas supply in north of Iran (Case Study)

机译:伊朗北部用于天然气供应的小型液化天然气工厂基础设施的可行性研究(案例研究)

获取原文
获取原文并翻译 | 示例
       

摘要

More than 85% of urban and 40% of rural areas of Iran are connected to the national gas pipeline network. For remaining areas of Iran, this method of gas transportation is not possible due to the great distance to the gas transmission lines, low population and mountainous areas. In order to reduce energy transportation cost, it is possible to use other methods such as CNG and LNG. For the first time, use of LNG for the purpose of gas supply to about 43,000 households in the north of Iran has been considered. In this paper, a techno-economical study has been carried out. The scope of study includes natural gas liquefaction plant, LNG storage tanks, LNG trucks and re-gasification stations. Choosing the proper capacity, cost estimation and calculation of operating fees for the implementation of this study is done. The calculations show that the cost of investing is 124 million Euros, (61 million Euros for refrigeration-liquefaction unit and 63 million Euros for the rest). The case study will be implemented as B.O.T. and the fee paid to investor per cubic meter of gas delivered to local gas networks is 14 cent Euro/m(3) for 20 years plant operation and 13% IRR.
机译:伊朗超过85%的城市地区和40%的农村地区与国家天然气管道网络相连。对于伊朗的其余地区,由于与天然气输送线的距离过长,人口少和山区,因此无法使用这种天然气运输方法。为了降低能量运输成本,可以使用其他方法,例如CNG和LNG。首次考虑将液化天然气用于伊朗北部约43,000个家庭的天然气供应。在本文中,进行了技术经济研究。研究范围包括天然气液化厂,液化天然气储罐,液化天然气卡车和再气化站。为执行本研究,选择了适当的容量,成本估算和运营费用计算。计算结果表明,投资成本为1.24亿欧元,(制冷液化装置为6100万欧元,其余为6300万欧元)。该案例研究将以B.O.T.在工厂运营20年后,每立方米向当地天然气网络输送的天然气向投资者支付的费用为14美分/立方米(3),内部收益率为13%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号