首页> 外文期刊>Space news >10-Year Plan for Astrophysics Takes JWST Cost into Account
【24h】

10-Year Plan for Astrophysics Takes JWST Cost into Account

机译:天体物理学的十年计划考虑了JWST成本

获取原文
获取原文并翻译 | 示例
       

摘要

Costly delays threatening the James Webb Space Telescope's 2014 launch could limit the funding available for NASA's next big-ticket space telescopes and a host of less-expensive projects deemed high priorities in the National Research Council's latest 10-year plan for space- and ground-based astronomy, senior NASA officials said.rnReleased Aug. 13, the As-tro2010 decadal survey - formally titled "New Worlds, New Horizons in Astronomy and Astrophysics" -designated the Wide-Field Infrared Survey Telescope (WFIRST) as the top priority for large missions for the decade ahead. WFIRST would be developed by NASA in partnership with the U.S. Department of Energy and launch in 2020 at an estimated cost of $1.6 billion to study dark energy, hunt for Earth-like planets and advance scientific understanding of the nature and evolution of galaxies.
机译:威胁詹姆斯·韦伯太空望远镜2014年发射的昂贵延误,可能会限制NASA下一代大型太空望远镜的可用资金,以及国家研究委员会最新的太空和地面十年计划中优先考虑的许多廉价项目美国国家航空航天局高级官员说,基于天文的太空研究工作于8月13日发布。2010年As-tro十年年代测量正式命名为“新世界,天文学和天体物理学的新视野”,将广域红外测量望远镜(WFIRST)指定为未来十年的大型任务。 WFIRST将由NASA与美国能源部合作开发,并于2020年发射,估计费用为16亿美元,用于研究暗能量,寻找类地行星并增进对星系性质和演化的科学理解。

著录项

  • 来源
    《Space news》 |2010年第33期|P.14|共2页
  • 作者

    AMY KLAMPER;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:24:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号