...
首页> 外文期刊>Space news >'Should Cost': An Alternative to Formal Proposals?
【24h】

'Should Cost': An Alternative to Formal Proposals?

机译:“应否花费”:正式提案的替代方案?

获取原文
获取原文并翻译 | 示例
           

摘要

Sometimes we in the U.S. acquisition business forget the most basic of rules, several of which are found in the Federal Acquisition Regulation under the section titled "1.102-2 - Performance Standards": 1."Satisfy the customer in terms of cost, quality, and timeliness of the delivered product or service." 2."The System must be responsive and adaptive to customer needs, concerns, and feedback. Implementation of acquisition policies and procedures, as well as consideration of timeliness, quality, and cost throughout the process, must take into account the perspective of the user of the product or service."
机译:有时,我们在美国的收购业务部门忘记了最基本的规则,其中一些规则在《联邦收购法规》标题为“ 1.102-2-绩效标准”的部分中找到:1.“在成本,质量,以及所交付的产品或服务的及时性。” 2.“系统必须响应并适应客户的需求,关注和反馈。在整个过程中,实施收购政策和程序以及及时性,质量和成本的考虑,必须考虑到用户的观点产品或服务。”

著录项

  • 来源
    《Space news》 |2012年第31期|p.1921|共2页
  • 作者

    JAMES GILL;

  • 作者单位

    University of Southern California's Defense & Strategic Studies Program, Security Studies Program and is currently employed at the U.S. Space and Missile Systems Center, Los Angeles Air Force Base;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号