...
首页> 外文期刊>SNL Energy Coal Report >BLM lists projects to be paused by new coal rule, projects subject to exemption
【24h】

BLM lists projects to be paused by new coal rule, projects subject to exemption

机译:BLM列出了将被新的煤炭法规暂停的项目,这些项目需要豁免

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

President Barack Obama's move to halt new coal leases on federal land until climate and tax implications are studied could stop more than 30 projects, but several could get a pass to continue through the pause. The U.S. Department of Interior provided a list of projects that are subject to exceptions to the pause on coal leases including several major existing coal projects seeking expansion. The controversial order announced Jan. 15 may not apply to some large projects such as Peabody Energy Corp.'s recent bid for a lease modification at Foidel Creek, or a modification to the Colowyo mine owned by Tri-State Generation and Transmission Association Inc. also part of a contentious environmental suit. A modification for Arch Coal Inc.'s controversial West Elk mine might also bypass the pause due to how far along they were in the process.
机译:巴拉克·奥巴马(Barack Obama)总统停止在联邦土地上的新煤炭租赁直到研究气候和税收影响的举动可能会终止30多个项目,但仍有几个项目可以通过以继续进行暂停。美国内政部提供了一份清单,这些清单可能会因暂停煤炭租赁而受到例外影响,其中包括一些寻求扩大规模的现有大型煤炭项目。 1月15日宣布的有争议的命令可能不适用于某些大型项目,例如Peabody Energy Corp.最近竞标Foidel Creek的租约修改或Tri-State Generation and Transmission Association Inc.拥有的Colowyo矿的修改。也是有争议的环保诉讼的一部分。由于Arch Coal Inc.备受争议的West Elk煤矿的改型也可能绕过停顿,原因是停工过程有多远。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号