首页> 外文期刊>Ships monthly >Poles revisit past project
【24h】

Poles revisit past project

机译:波兰人重温过去的项目

获取原文
获取原文并翻译 | 示例
       

摘要

The Polish MoD has selected Thales to provide the main combat system for the future patrol vessel ORP Slazak, as the warship edges ever closer to being finished, having been under construction for more than a decade. She was originally laid down at the Gdynia Naval shipyard in 2001 as the first of seven Gawron class corvettes. However, the programme encountered a series of planning delays and funding shortfalls during the economic downturn. When the project was eventually cancelled in 2012 only one hull, minus equipment, had been constructed.
机译:波兰国防部已选择泰雷兹为未来的巡逻舰ORP Slazak提供主要的战斗系统,因为这艘战舰的边缘已经接近建造完毕,已经建造了十多年。她最初于2001年在格丁尼亚海军造船厂安放,是七艘Gawron级护卫舰中的第一艘。但是,该计划在经济下滑期间遇到了一系列计划上的延误和资金短缺。当该项目最终在2012年取消时,只建造了一个船体,减去设备。

著录项

  • 来源
    《Ships monthly》 |2014年第6期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:42:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号