首页> 外文期刊>Regulated Rivers Research & Management >River rehabilitation from the Hydrogeomorphic impacts of a large hydro-electric power project: snowy river, Australia
【24h】

River rehabilitation from the Hydrogeomorphic impacts of a large hydro-electric power project: snowy river, Australia

机译:大型水力发电项目的水文地貌影响下的河流修复:澳大利亚雪河

获取原文
获取原文并翻译 | 示例
       

摘要

Large interbasin water transfers for hydro-electric power generation have substantially changed the hydrology of the Snowy river below the Snowy Mountains Hydro-Electric Scheme in southeastern Australia, since 1967. Annual, Monthly, mean daily and peak instantaneous flows have been significantly reduced and flood variability greatly Increased along 352 km of channel. The first 70 km of river has responded by substantial contraction through the Reworking of tributary mouth bars into downstream pools, bars and benches.
机译:自1967年以来,大型跨流域用于水力发电的输水已大大改变了澳大利亚东南部雪山水电计划下的雪河的水文状况。年,月,平均日和峰值瞬时流量已大大减少,洪水变异性沿352公里的航道大大增加。前70公里的河流通过将支流口坝改建为下游的水池,坝和台阶而产生了很大的收缩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号