首页> 外文期刊>Railway Track and Structures >$105M finalized for Crescent Corridor intermodal facilities
【24h】

$105M finalized for Crescent Corridor intermodal facilities

机译:为新月走廊多式联运设施最终敲定的1.05亿美元

获取原文
获取原文并翻译 | 示例
       

摘要

Construction can begin on two intermodal freight facilities in Memphis and Birmingham thanks to a signed grant agreement with the Alabama and Tennessee Departments of Transportation for $105 million in funds from the Transportation Investment Generating Economic Recovery program included in the American Recovery and Reinvestment Act. The facilities are a key part of a larger effort to increase rail capacity and relieve traffic congestion along the 2,500-mile Crescent Corridor from the Gulf Coast to the Mid-Atlantic.
机译:得益于与阿拉巴马州和田纳西州交通运输部签署的赠款协议,美国《复苏与再投资法案》中包含的“运输投资促成经济复苏”计划拨款1.05亿美元,因此可以在孟菲斯和伯明翰建造两个联运货运设施。这些设施是加大力度,缓解从墨西哥湾沿岸到大西洋中部2,500英里新月走廊沿线交通拥堵的更大努力的关键部分。

著录项

  • 来源
    《Railway Track and Structures》 |2011年第2期|p.68|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:26:30

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号