...
首页> 外文期刊>Railway Age >FRA Issues RRP Final Rule
【24h】

FRA Issues RRP Final Rule

机译:FRA问题RRP最终规则

获取原文
获取原文并翻译 | 示例

摘要

THE FEDERAL RAILROAD ADMINISTRATION (FRA) has issued a final rule-49 CFR Part 271 [Docket No. FRA-2009-0038, Notice No. 7] RIN 2130-AC11-launching the Risk Reduction Program (RRP) "to support an increasing standard of safety for the nation's freight railroads." The final rule is effective April 20,2020. The rulemaking, which implements a mandate required by the Rail Safety Improvement Act of 2008, requires "all Class I freight railroads and Class II and III freight railroads with inadequate safety performance to develop and implement a Risk Reduction Program to improve the safety of its operations," the rulemaking says. FRA describes an RRP as "a comprehensive, system-oriented approach to safety that determines a railroad operation's level of risk by identifying and analyzing applicable hazards, and involves developing plans to mitigate, if not eliminate, that risk."
机译:联邦铁路管理局(FRA)已发布最终规则-49 CFR第271部分[DOCKET No.FRA-2009-0038,第7号通知7] RIN 2130-AC11-发射风险减少计划(RRP),以支持增加国家货运铁路的安全标准。“最终规则是4月20日起生效。实施2008年铁路安全改进法案所需的授权的规则需要“所有I级货运铁路和二级和III级货运铁路,安全性能不足,以制定和实施风险降低计划,以提高其运营的安全性“训练说。 FRA将RRP描述为“以全面的系统为导向的安全方法,通过识别和分析适用和分析适用的危险来确定铁路运营的风险水平,并涉及开发减轻计划的计划,如果不是消除风险。”

著录项

  • 来源
    《Railway Age》 |2020年第3期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号