首页> 外文期刊>Rail Business Intelligence >Nxec, Db And Dft Object
【24h】

Nxec, Db And Dft Object

机译:Nxec,Db和Dft对象

获取原文
获取原文并翻译 | 示例
       

摘要

During consultation on the proposed decision, NXEC challenged ORR's interpretation of its statutory role while DB Schenker expressed concern over the loss of capacity for growth in freight traffic. ORR had stated that it 'had not seen any clear evidence that freight traffic in the relevant period would require more capacity than that indicated would be available in Network Rail's report. This was particularly true given that most of the predicted growth in container traffic was not expected until after 2012'. ORR took its decision following a further report from NR which confirmed that the '6+1' pathing scenario offered a clear improvement on the current freight provision, by providing a two-hourly Class 4 path and a two-hourly Class 6 path in both directions. In addition, in the Up direction only there would be a further two-hourly Class 4 path.
机译:在就拟议的决定进行磋商时,NXEC挑战了ORR对其法定角色的解释,而DB Schenker对货运量增长能力的丧失表示关注。 ORR表示,它“没有明显的证据表明在相关时期内的货运量将需要比Network Rail的报告中显示的容量更多的容量。考虑到大多数预计到2012年以后的集装箱运输量增长,这一点尤其正确。 NR收到进一步的报告后,ORR做出了决定,该报告证实了“ 6 + 1”路径情景通过在两个路径中均提供两个小时的4级路径和一个两个小时的6级路径,明显改善了当前的货运量指示。此外,仅在“向上”方向上还有另外两个小时的“ Class 4”路径。

著录项

  • 来源
    《Rail Business Intelligence》 |2009年第337期|p.3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:16:31

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号