首页> 外文期刊>Rail business intelligence >EMT spends £22m at Etches Park
【24h】

EMT spends £22m at Etches Park

机译:EMT在蚀刻公园花费2200万英镑

获取原文
获取原文并翻译 | 示例
       

摘要

Stagecoach Group Chief Executive Brian Souter officially opened the new Etches Park North depot in Derby on May 20. Built at a cost of £22m, it complements an existing facility to provide additional capacity for maintaining East Midlands Trains' fleet of 27 Bombardier Class 222 Meridian DEMUs. Designed and built by C Spencer Ltd over a period of 17 months, the new facility has three roads, one equipped with synchronised Pffaf jacks capable of lifting a seven-car Meridian. Other equipment includes a Kone overhead crane and a Hegenscheidt wheel lathe.rnEnhanced fuelling facilities are also provided.
机译:Stagecoach集团首席执行官Brian Souter于5月20日在德比正式开设了新的Etches Park North仓库。该项目耗资2200万英镑,是对现有设施的补充,以提供额外的能力来维护East Midlands Trains的27庞巴迪222级子午线车队DEMU。新设施由C Spencer Ltd设计和建造,历时17个月,共有3条道路,一条道路装有同步Pffaf千斤顶,能够举起7辆经络车。其他设备包括Kone高架起重机和Hegenscheidt轮式车床。还提供增强的加油设施。

著录项

  • 来源
    《Rail business intelligence》 |2010年第367期|P.6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:07

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号