首页> 外文期刊>Parking Review >A model car park - BAA is spending over £50m on a car park at Heathrow Airport
【24h】

A model car park - BAA is spending over £50m on a car park at Heathrow Airport

机译:样板停车场-BAA在希思罗机场的停车场上花费了超过5,000万英镑

获取原文
获取原文并翻译 | 示例
       

摘要

Customers using the new Car Park West won't think twice about how it came to be there. It will be just another distress purchase, though hopefully one that isn't distressing for them to use," says David Rebello, BAA project leader for Car Park West, reflecting on the progress made to date on this major parking infrastructure project at Heathrow airport. "In fact, all the distress was on us when we embarked on the design and construction of the car park, considering the constraints and obstacles that had to be overcome in its building." The driving public who start using Car Park West next summer will be blissfully unaware of the massive civil engineering feat that was required just to create the car park's foundations. "Instead of looking at this as a five-storey, 1,580-space car park, think of an iceberg, a third of which is above the waterline and ponder the problematic two-thirds that lie below it," says Rebello. "Then consider that what is below this waterline has absolutely nothing to do with the car park construction or operation itself. That is the scale of the problems that came with the territory."
机译:使用新的Car West的客户不会对它的出现方式三思而后行。这将是又一次困难重重的采购,尽管希望不会让他们痛苦。”西区停车场的BAA项目负责人David Rebello说,他回顾了希思罗机场这一大型停车基础设施项目迄今取得的进展“实际上,考虑到在其建筑中必须克服的限制和障碍,当我们着手进行停车场的设计和建造时,所有的困扰都在我们身上。”明年夏天开始使用Car West的驾车人士我们将非常高兴地意识到建立停车场基础所需的庞大的土木工程壮举。“与其将这看做一个五层楼,1,580个空间的停车场,不如想像一座冰山,其中三分之一以上Rebello说:“然后,考虑水位线以下问题的三分之二。然后,考虑该水位线以下的部分与停车场的建设或运营本身完全无关。这就是领土带来的问题的严重程度。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号