首页> 外文期刊>Rail Business Intelligence >Hackney Wick rebuild starts
【24h】

Hackney Wick rebuild starts

机译:哈克尼威克重建开始

获取原文
获取原文并翻译 | 示例
           

摘要

On behalf of the London Legacy Development Corporation, Network Rail has begun work on a £25m project at Hackney Wick station, including the construction of a new entrance and ticket hall at street level. Work is due for completion in January 2018. Lifts are to be installed to provide access to the platforms, and a new subway is to be driven through the railway embankment to connect Wallis Road with White Post Lane. The subway is cur- rently under construction on land adjacent to the station and will be moved into position in spring 2017.
机译:Network Rail代表伦敦遗产发展公司(Longacy Legacy Development Corporation)开始在哈克尼威克车站(Hackney Wick station)进行的一项2500万英镑的项目,其中包括在街道一级建造新的入口和售票厅。工程预计于2018年1月完成。将安装升降机以提供通往平台的通道,并将通过铁路路堤驾驶新的地铁连接华利斯路和怀特波斯特巷。目前,该地铁站附近的土地上正在建设中,将于2017年春季移入位置。

著录项

  • 来源
    《Rail Business Intelligence》 |2017年第527期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号