首页> 外文期刊>Rail Business Intelligence >RAIB investigates Cardiff signalling irregularity
【24h】

RAIB investigates Cardiff signalling irregularity

机译:RAIB调查卡迪夫信号异常

获取原文
获取原文并翻译 | 示例
           

摘要

Network Rail's work programme last Christmas included commissioning the final stage of the much-delayed Cardiff Area Resig-nalling Scheme (RB1525 p2). This included track remodelling in and around Cardiff CentTal station plus the transfer of signalling control to the South Wales Control Centre. Some of the new track layout was brought into use on December 29. That morning, as the first train on the Up Llandaff Line over the new layout was leaving Platform 7, the driver noticed that a set of points in the route his train was about to take were not set in the correct position and stopped the train.
机译:去年圣诞节,Network Rail的工作计划包括调试延误很久的加的夫地区重新定居计划(RB1525 p2)的最后阶段。这包括在加的夫CentTal车站及其周围进行轨道改建,以及将信号控制权转移到南威尔士控制中心。一些新的轨道布局已于12月29日投入使用。当天早上,随着新布局的上兰达夫线上的第一趟火车离开7号站台,驾驶员注意到他的火车所行驶路线中的一些点要采取的是没有设置在正确的位置,并停止了火车。

著录项

  • 来源
    《Rail Business Intelligence》 |2017年第527期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号