Weighbridge control system improves turnaround times for Ennstone Johnston

机译:地磅控制系统缩短了Ennstone Johnston的周转时间

获取原文
获取原文并翻译 | 示例
           

摘要

Trucks are now processed eight times faster at Ennstone Johnston's Cloud Hill site, in the East Midlands, following the installation of a new weighbridge control system from Avery Weigh-Tronix. The company needed to increase the throughput of trucks in and out of the site following the opening of a new asphalt plant at the quarry. Previously, wagons checked in and out at the same weighbridge station, which meant long queues at busy times. While the actual filling time only took 5min, it could take nearly an hour to get a truck in and out of the site due to the bottleneck. Critically, asphalt was reducing in temperature by up to 50% while waiting to leave the site.
机译:在安装了Avery Weigh-Tronix的新型地磅控制系统之后,现在卡车在Ennstone Johnston位于东部中部地区的Cloud Hill站点的处理速度提高了八倍。在采石场开设新的沥青厂之后,该公司需要提高卡车进出场地的吞吐量。以前,货车是在同一个地磅桥车站进出的,这意味着在繁忙时间排长队。尽管实际的填充时间仅用了5分钟,但由于瓶颈,将卡车运进或运离现场可能要花费近一个小时。至关重要的是,在等待离开场地时,沥青的温度降低了多达50%。

著录项

  • 来源
    《Quarry Management》 |2008年第3期|p.35-37|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号