...
首页> 外文期刊>Quality Control, Transactions >Two-Layer Optimization Scheduling Model of Integrated Electricity and Natural Gas Energy System Considering the Feasibility of Gas-Fired Units’ Reserve
【24h】

Two-Layer Optimization Scheduling Model of Integrated Electricity and Natural Gas Energy System Considering the Feasibility of Gas-Fired Units’ Reserve

机译:考虑燃气单位储备可行性的综合电力和天然气能源系统的两层优化调度模型

获取原文
获取原文并翻译 | 示例

摘要

The reserve scheduling is important for integrated energy systems to cope with sudden disturbances such as fluctuations of renewable energy. The existing reserve scheduling approaches for integrated energy systems need iterations of calculation to guarantee the feasibility of the gas-fired units & x2019; reserve, leading to problem of high computational burden. In this paper, a two-layer optimization model is proposed to set the boundary of the gas-fired units & x2019; power and reserve, so that the scheduling result can meet the gas network constraints. The proposed two-layer optimization framework can avoid repeated loop iterations, resulting in low computational complexity. Testing results verify the effectiveness of the proposed method.
机译:储备调度对于综合能源系统对于应对突发性扰动,例如可再生能源的波动等综合能源系统很重要。综合能源系统的现有储备调度方法需要迭代计算,以保证燃气单位和X2019的可行性;储备,导致高计算负担问题。在本文中,提出了一种双层优化模型,设定了燃气机组的边界和X2019;电源和保留,使调度结果可以满足气体网络约束。所提出的双层优化框架可以避免重复的循环迭代,从而导致计算复杂性低。测试结果验证了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号