A new management tool and mathematical model for decommissioning cost estimation of multiple reactors site

机译:用于多反应堆场址退役成本估算的新管理工具和数学模型

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The decommissioning of a nuclear power plant/site is a very complex process that is necessary to be performed at the end of its useful life to allow its release from regulatory control and a new use of the site by the society. Typically, a decommissioning project requires the management of several tasks and resources. In case of multiple reactors site, this management becomes harder since the interdependencies between each plant could influence the way that the tasks could be executed as well as its schedules. In literature is possible to find different kinds of tools for planning and management purposes, some of them specific for nuclear installations decommissioning projects. This is the case of tools based on the ISDC. However, these tools do not allow to consider rightly the interdependencies and previous learning. Notwithstanding, most part of existent tools/methods requires a large quantity of data/information to produce consistent results. However, this data often is unknown, requiring assumptions to justify some values, which enhances the uncertainties of the results. To overcome these difficulties, the present work will introduce a management tool and detail its mathematical model. This mathematical model aims to cost estimate the decommissioning cost for budget/bid purposes. The main differential of the model is that it requires a significantly less data compared with models available in literature. As part of the work objectives, a novel method for attribute values to the difficulty values and contingencies is presented. In addition, a validation simulation is presented as well as a sensibility analysis. The validation was performed considering a Brazilian nuclear power plant as case study, which had its decommissioning cost estimated in about US$761.7 million. The sensibility analysis indicates that is interesting to postpone the beginning of decommissioning some years after plant shutdown since it allows not only some radiological results but also a cost reduction.
机译:核电厂/站点的退役是一个非常复杂的过程,必须在其使用寿命结束时执行,以使其从监管控制中释放出来,并被社会重新使用。通常,退役项目需要管理多个任务和资源。在有多个反应堆的情况下,这种管理变得更加困难,因为每个工厂之间的相互依赖关系可能会影响任务的执行方式及其时间表。在文献中可以找到用于规划和管理目的的各种工具,其中一些专门用于核设施退役项目。基于ISDC的工具就是这种情况。但是,这些工具不允许正确考虑相互依赖性和先前的学习。尽管如此,大多数现有工具/方法仍需要大量数据/信息才能产生一致的结果。但是,此数据通常是未知的,需要进行假设以证明某些值的合理性,从而增加了结果的不确定性。为了克服这些困难,本工作将介绍一种管理工具并详细说明其数学模型。该数学模型旨在为预算/投标目的对退役成本进行成本估算。该模型的主要区别在于,与文献中可用的模型相比,它需要的数据要少得多。作为工作目标的一部分,提出了一种将属性值分配给难度值和意外事件的新方法。此外,还提供了验证模拟以及敏感性分析。验证是将巴西一家核电厂作为案例研究进行的,该电厂的退役成本估计约为7.617亿美元。敏感性分析表明,在工厂停产后将退役开始推迟很有趣,因为它不仅可以带来一些放射学结果,而且可以降低成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号