Potential areas for nuclear power plants siting in Saudi Arabia: GIS-based multi-criteria decision making analysis

机译:沙特阿拉伯核电站的潜在选址:基于GIS的多标准决策分析

获取原文
获取原文并翻译 | 示例
           

摘要

This paper reports the identification modus operandi (in Phase-I) of prospective sites to situate nuclear power plants (NPPs) in Saudi Arabia. Currently, the nation has taken a strategic imitative to introduce nuclear power to resolve future energy crises. Potential areas for installing these NPPs were determined via geographical information system (GIS)-based multi-criteria decision making approach. Nine significant criteria were applied to screen out unsuitable areas for such NPPs construction. Results revealed that scarcity of water in Saudi Arabia was the major reason to discard 96% of the possible sites. Furthermore, the overlaying process of all these criteria could dispose of nearly 98% of the contiguous Saudi lands. The remaining 2% land area was discerned to be suitable for positioning NPPs, which amounts to an area coverage of 21473 km(2) and 13395 km(2) on the western and eastern coast, respectively. The dominant siting issues on the western coast were related to the geological features (slope, fault, and flood), while the population concern could overweigh the others on the eastern coast. Meanwhile, the survey revealed that the sea-level rise sensitivity must be considered on the eastern coast for the safe operation of NPPs. Further analyses disclosed that sea-level rise of about 2 m could reduce the possible land areas by 20% and 13% in the eastern and western coast correspondingly. The net feasible areas were inversely proportional to the aggregation of suitable lands into specific NPP footprint. It was established that the proposed assemblage strategy could reduce the net effective area on the western coast for siting the NPPs such as SMR350 (small reactor), AP1000 (moderate reactor) and EPR1600 (large reactor) by almost 22%, 37%, and 47%, respectively. Present findings may constitute a basis for future development in selecting particular sites for NPP installation in Saudi Arabia.
机译:本文报告了在沙特阿拉伯部署核电厂的预期场所的识别方法(第一阶段)。目前,该国已采取战略模仿措施,引入核电来解决未来的能源危机。通过基于地理信息系统(GIS)的多标准决策方法确定了安装这些NPP的潜在区域。应用了九个重要标准来筛选出不适合此类NPP建设的区域。结果表明,沙特阿拉伯缺水是丢弃96%可能地点的主要原因。此外,所有这些标准的叠加过程都可以处理将近98%的沙特土地。剩下的2%的土地面积被认为适合放置NPP,在西部和东部海岸的面积分别为21473 km(2)和13395 km(2)。西海岸的主要选址问题与地质特征(坡度,断层和洪水)有关,而对人口的关注可能超过东海岸的其他问题。同时,调查显示,为确保核电厂的安全运行,必须考虑东部沿海的海平面上升敏感性。进一步的分析表明,大约2 m的海平面上升可以使东部和西部海岸的可能土地面积分别减少20%和13%。净可行面积与适当土地向特定NPP足迹的聚集成反比。已经确定,拟议的组装策略可以将西海岸的净有效面积(如SMR350(小型反应堆),AP1000(中型反应堆)和EPR1600(大型反应堆)等核电站的选址减少近22%,37%和47%。目前的发现可能为将来在沙特阿拉伯选择安装NPP的特定地点奠定了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号