首页> 外文期刊>Professional mariner >Salvors complete removal of stern of bulker that grounded off Gibraltar
【24h】

Salvors complete removal of stern of bulker that grounded off Gibraltar

机译:救助人员彻底清除了停靠直布罗陀的散货船尾

获取原文
获取原文并翻译 | 示例
       

摘要

After over four months of work, Donjon Marine Co. has completed the salvage of M/V Fedra, the 738-foot bulk carrier that ran aground off Gibraltar in October 2008 during a storm.rnBill Kratz, Donjon Marine's salvage master, said that the most difficult part of the job was carefully cleaning up the potential pollutants from the engine room and making sure that they were not released into the environment.
机译:经过四个多月的工作,Donjon Marine Co.公司完成了救助M / V Fedra的工作,这艘738英尺的散货船于2008年10月在一场暴风雨中在直布罗陀搁浅。DonjonMarine的救助船长比尔·克拉茨(Bill Kratz)说,工作中最困难的部分是仔细清理机舱中的潜在污染物,并确保它们不会释放到环境中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号