Burnton railway viaduct in Ayrshire, Scotland, carries the freight-only, single-track Waterside branch line from Dalrymple Junction to Chalmerston coal yard over the Purclewan Burn and the B742. The striking grade 'B' listed structure was constructed in 1889, is curved in plan and comprises 16 masonry arch spans. A permanent speed restriction of 5 miles/h had been imposed on the line and the structure was being constantly monitored in real time using accelerometers attached to the arch intrados and the vertical face of the spandrel walls. In 2001 the structure began to exhibit an increase in 'liveliness' during the passage of the trains. This movement was investigated by Railtrack engineering staff as a matter of urgency. As part of their commitment to maintain the safe and efficient operation of the railway, Railtrack (succeeded by Network Rail) commissioned John Mowlem Ltd (now Carillion JM Ltd), through its alliance contract, to investigate the problem and prepare a cost-effective solution in accordance with the line classification. In turn, Carillion appointed Scott Wilson Scotland Ltd (SWSL) as its designer. Initially, SWSL and Carillion undertook a joint investigation of the viaduct, which was quickly followed by an assessment of the structure. This confirmed that there was a need to undertake a comprehensive programme of strengthening and refurbishment. This paper describes the techniques adopted to stabilise the viaduct and the methods of construction.
机译:苏格兰艾尔郡的伯顿铁路高架桥载有仅货物运输的单线Waterside支线,从达勒姆普尔交界处到珀克尔旺伯恩和B742的查默斯顿煤场。引人注目的“ B”级建筑始建于1889年,平面弯曲,包括16个砌体拱跨。生产线上施加了5英里/小时的永久速度限制,并使用连接到拱形拱门和翼span壁垂直面的加速度计对结构进行实时实时监控。在2001年,火车通行时,结构开始表现出“活泼”的增强。紧急情况下,Railtrack工程人员对该运动进行了调查。作为维护铁路安全高效运行的承诺的一部分,Railtrack(由Network Rail成功)委托John Mowlem Ltd(现为Carillion JM Ltd)通过其联盟合同调查问题并制定具有成本效益的解决方案按照线路分类。反过来,Carillion任命Scott Wilson Scotland Ltd(SWSL)作为设计师。最初,SWSL和Carillion对高架桥进行了联合调查,之后迅速进行了结构评估。这证实了有必要执行一项全面的加强和翻新计划。本文介绍了用于稳定高架桥的技术和施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号