...
首页> 外文期刊>Proceedings of the Institution of Civil Engineers. Geotechnical Engineering >Performance of bored piles with different construction methods
【24h】

Performance of bored piles with different construction methods

机译:不同施工方法的钻孔桩性能

获取原文
获取原文并翻译 | 示例
           

摘要

The design of bored piles in residual soil is usually based on empirical correlation with the results of the standard penetration test, regardless of the construction method of the bored pile. This paper presents the pile load test results of two bored piles with different construction methods. A preliminary bored pile of 1000 mm diameter was constructed using a wet method with bentonite as the stabilising fluid. The static pile load test result shows that the shaft friction could be overestimated by the empirical method. A 1200 mm diameter bored pile was constructed about 5 m away from the preliminary bored pile but using the dry method. The static pile load test result shows that higher shaft friction can be obtained. The empirical method could underestimate the shaft friction in this case.
机译:无论钻孔桩的施工方法如何,残余土壤中钻孔桩的设计通常基于与标准渗透试验结果的经验相关性。本文介绍了两种不同施工方法的钻孔桩的桩载荷试验结果。使用膨润土作为稳定液的湿法构造了直径为1000 mm的钻孔桩。静力桩载荷试验结果表明,经验法可能会高估轴的摩擦力。在距初始钻孔桩约5 m处构造了直径1200 mm的钻孔桩,但使用的是干法。静桩载荷试验结果表明,可以获得更高的轴摩擦力。在这种情况下,经验方法可能会低估轴的摩擦力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号