首页> 外国专利> Railway track foundation method using bored piles for slabs - comprises drilling high pressure air and water spoil removal and grouting pile cap construction track lifting and supporting slab construction

Railway track foundation method using bored piles for slabs - comprises drilling high pressure air and water spoil removal and grouting pile cap construction track lifting and supporting slab construction

机译:使用钻孔桩作为板的铁路轨道基础方法-包括钻孔高压气水和水垢清除和注浆桩帽施工轨道提升和支撑板施工

摘要

A method for founding pile caps (42) for supporting long secondary slabs (41) carrying railway tracks (30), comprises boring (33,34) the ground under and as close as possible to the tracks, and pressure grouting the bores. Caps are then constructed on the piles on a cement aggregate bed. The track between is then split up, lifted and equivalent ground volume between is excavated for the new track supporting slabs. Grout is injected at high pressure through holes in drill beside the bit after removal of spoil with very high pressure air and water jets. USE/ADVANTAGES - Improved method, eliminates intermediate operations.
机译:一种建立桩帽(42)以支撑承载铁路轨道(30)的较长的次平板(41)的方法,该方法包括在(33,34)钻孔下方并尽可能靠近轨道钻孔,并对孔进行压力灌浆。然后在水泥骨料床上的桩上盖好瓶盖。然后,将中间的轨道分开,抬起,并为新的轨道支撑板挖掘出相等的地面体积。在用非常高压的空气和水喷射清除掉残渣之后,通过钻头旁边的钻头中的孔以高压注入水泥浆。使用/优点-改进的方法,消除了中间操作。

著录项

  • 公开/公告号FR2698114A1

    专利类型

  • 公开/公告日1994-05-20

    原文格式PDF

  • 申请/专利权人 BEAUTHIER JEAN MARIE;

    申请/专利号FR19920013865

  • 发明设计人 BEAUTHIER JEAN-MARIE;

    申请日1992-11-18

  • 分类号E02D27/48;E01D19/02;E01D19/12;E02D5/46;

  • 国家 FR

  • 入库时间 2022-08-22 04:33:39

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号