Instrumentation At Changi Land Reclamation Project, Singapore

机译:新加坡樟宜土地开垦项目的仪器仪表

获取原文
获取原文并翻译 | 示例
           

摘要

Ground improvement is often required in land reclamation projects on soft soil deposits to reduce future settlement under the projected future dead and live loads. In the case of thick deposits of marine clay, it is often necessary to accelerate the consolidation process of the clay using prefabricated vertical drains. In such projects, the degree of improvement has to be ascertained to confirm whether the soil has achieved the required degree of consolidation before the removal of surcharge. This analysis can be carried out by means of observational methods for which the ground behaviour is continuously monitored from the date of instrument installation. This paper provides a case study of the applications of geotechnical instrumentation for construction control in the Changi East reclamation project in the Republic of Singapore. Field instruments adopted in this project included settlement plates, deep settlement gauges, earth pressure cells, pneumatic piezometers, electric piezometers and water standpipes. Some of the field instruments were installed offshore. Special techniques were adopted to protect these offshore instruments before placement of sand fill by hydraulic pumping. Geotechnical instruments were also used in the construction control process to monitor the deformation of ground and the stability of the earth and retaining structure. Field instrumentation readings obtained from a pilot test area comprising a vertical drain area (horizontal vertical drain spacing 1.5 m × 1.5 m) and an adjacent control area (no vertical drains) are also presented in this paper.
机译:在软土沉积的土地开垦项目中,经常需要对地面进行改良,以减少在预计的未来静载和活载下的未来沉降。对于厚厚的海洋粘土沉积物,通常需要使用预制的垂直排水管来加速粘土的固结过程。在这些项目中,必须确定改善的程度,以确认土壤是否已达到去除附加费之前的固结程度。可以通过观察方法进行此分析,从仪器安装之日起就对其地面行为进行连续监视。本文提供了在新加坡共和国樟宜东填海工程中岩土仪器在建筑控制中的应用案例研究。该项目采用的现场仪器包括沉降板,深层沉降计,土压力计,气压计,电压计和水立管。一些现场仪器安装在海上。在通过液压泵注满沙子之前,采用了特殊技术来保护这些海上仪器。在工程控制过程中还使用了岩土工程仪器来监测地面变形以及土层和挡土结构的稳定性。本文还介绍了从包括垂直排水区(水平垂直排水口间距1.5 m×1.5 m)和相邻控制区(无垂直排水口)的中试区域获得的现场仪表读数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号