Field instrumentation case study at a pilot site in the Changi land reclamation project

机译:樟宜土地开垦项目中的一个试点现场仪器案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Since the early 1990's till early 2000s, the Changi East Reclamation Project in the Republic of Singapore involved the filling of approximately 200 million cubic meters of sand for the reclamation of a total land area of about 2500 hectares. The land reclamation works were carried out in 5 phases. The edges of the newly reclaimed land in the project were either retained by vertical retaining structure or coastal shore protection rock bund with suitable slopes and stability berms. Land reclamation was carried out using fill materials derived from dredging granular material from the seabed at the borrow source. Prefabricated vertical drains with surcharge were used extensively in the project to accelerate the consolidation process. In addition, the hydraulically placed sandfill was densified by using various deep compaction methods. Geotechnical instruments were required to monitor the settlement and pore pressure during the consolidation of soft soil. During the implementation of the 5 phases of land reclamation and soil improvement projects, geotechnical instruments of various types were installed. In order to monitor the performance of ground improvement and to validate the efficiency of the prefabricated vertical drain system several geotechnical instruments were installed in a Pilot Test site within one of the phases of work. This paper provides a case study of the performance of a Pilot Test Site carried out in the Changi East Reclamation Project (Phase 1B).
机译:自1990年代初至2000年代初,新加坡共和国的樟宜东部填海项目涉及填筑约2亿立方米的沙子,用于填海,土地总面积约为2500公顷。土地复垦工作分五个阶段进行。该项目中新开垦土地的边缘要么通过垂直固定结构进行固定,要么通过具有适当坡度和稳定护堤的沿海保护岩石障壁进行固定。填海工程是使用填充材料进行的,该填充材料是从借款人的海床挖出颗粒状材料而来的。带有附加费的预制垂直排水沟在该项目中被广泛使用,以加速加固过程。另外,通过使用各种深层压实方法将水力压实的填埋场致密化。需要土工仪器来监测软土固结过程中的沉降和孔隙压力。在土地复垦和土壤改良项目的五个阶段的实施过程中,安装了各种类型的岩土仪器。为了监测地面改善的性能并验证预制垂直排水系统的效率,在工作阶段之一的先导测试现场安装了一些岩土工程仪器。本文提供了在樟宜东部填海项目(第1B阶段)中进行的试验场性能测试的案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号