Application of observational method at Crossrail Tottenham Court Road station, UK

机译:观测方法在英国Crossrail Tottenham Court Road车站的应用

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Excavation of the western ticket hall box at Tottenham Court Road station represented a critical path activity of the Crossrail railway project in London, UK. Base slab construction and preparatory sprayed concrete lining works needed to be completed before the arrival of the two tunnel boring machines. A full observational method (OM) design was implemented to eliminate the lowest level of temporary propping, resulting in a 13 m prop-free excavation at the bottom of the 30 m deep diaphragm wall station box. This paper describes the design and successful implementation of the OM, which eliminated the need to fabricate, install and remove the fifth level of temporary propping. It covers the comprehensive review of the original design input parameters, back analysis of the most probable geotechnical design parameters and comparison of wall deflection and forces in the temporary props from early stages of the construction works. The robust strategy formulated as part of the observational method design to control the subsequent excavation is described: this included trigger criteria, a review process and predetermined contingency measures to ensure safe execution of the excavation works. A genuinely collaborative effort between client, permanent and temporary works designers, independent design checker and the contractor is elaborated. Cost and programme savings achieved by implementation of the observational method approach are outlined.
机译:在托特纳姆法院路站的西部售票厅箱的开挖代表了英国伦敦Crossrail铁路项目的关键路径活动。在两台隧道掘进机到达之前,必须完成基础板的施工和预喷涂混凝土衬砌的工作。实施了完整的观测方法(OM)设计,以消除最低水平的临时支撑,从而在30 m深的隔板墙站箱的底部进行了13 m的无支撑开挖。本文介绍了OM的设计和成功实施,从而消除了制造,安装和移除第五层临时支撑的需求。它涵盖了对原始设计输入参数的全面审查,对最可能的岩土工程设计参数的反向分析以及在施工初期就对临时支柱中的墙体挠度和力进行了比较。描述了作为观察方法设计的一部分来控制后续挖掘的稳健策略:这包括触发标准,审查过程和预定的应急措施,以确保挖掘工作的安全进行。详细阐述了客户,永久和临时工程设计师,独立设计检查人员与承包商之间的真诚合作。概述了通过实施观测方法所实现的成本和计划节省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号