This paper provides a summary report on measures taken to remove embedded steel 'H' pile obstacles from the cutter head of an advancing tunnel-boring machine. The piles were part of the soil-mixing retaining wall built for the cut-and-cover tunnel construction of a Taiwan high-speed rail tunnel and a Taiwan railways administration tunnel, which were directly above the mass rapid transit tunnel that was to be constructed. The collision zone between the boring machine and piles was below groundwater level and was approximately 23 m below the ground surface in a silty sand layer. To remove the piles safely from the cutter head, horizontal grouting from two adjacent work pits was conducted for waterproofing and solidification purposes. By controlling the amount of soil being flushed out during the grout hole drilling first, and also the pressure used for grouting later, the measured tunnel settlement resulting from grouting was negligible. Because of the favourable watertightness of the grouted zone and the dewatering influence of a nearby construction site, pile removal was conducted under particularly dry working conditions. In total, 12 piles were identified in the collision zone and were successfully removed from the cutter head by hand tools.
机译:本文提供了有关采取的措施的摘要报告,这些措施是从行进的隧道掘进机的刀盘上清除嵌入的“ H”形钢桩障碍物。这些桩是在台湾高铁隧道和台湾铁路管理隧道的挖填式隧道建设中修建的土拌和挡土墙的一部分,这些隧道位于将要建设的大众快速运输隧道的正上方。钻孔机与桩之间的碰撞区在地下水位以下,在粉砂层中约低于地面23 m。为了安全地从割刀头上移走桩,从两个相邻的工作坑进行了水平灌浆,以防水和固化。通过首先控制在灌浆孔钻孔过程中冲洗掉的土壤量,再控制随后用于灌浆的压力,由灌浆产生的实测隧道沉降可以忽略不计。由于灌浆区良好的水密性以及附近施工现场的脱水影响,因此在特别干燥的工作条件下进行了打桩。总共在碰撞区中发现了12根桩,并通过手动工具成功将其从刀头上移开。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号