In 2011 a contract was signed for the construction of Copenhagen's new metro line, Cityringen, which will connect 17 new underground stations in and around the centre of Copenhagen. To assist with the development of the city it was decided in 2012 and 2014 to add branches to Cityringen connecting the city centre with north and south harbour areas, respectively. This required the introduction of bifurcations to connect the branches to Cityringen tunnels. The bifurcations were made with the substantial modification of a shaft at Oster Sogade and the introduction of a new shaft, Havneholmen. This paper outlines both engineering and logistical challenges introduced by these changes, from the construction of a 35 m deep shaft around existing stacked tunnels adjacent to an operational railway line to how the closing tunnels for the construction of the shaft impacted the tunnel installations and the overall time schedule, plus numerous other issues.
机译:2011年,合同签署了哥本哈根新地铁线,Citycingen的建设,这将在哥本哈根市中心和周围连接17个新的地铁站。 为协助开发城市,在2012年和2014年决定将分支机构加入与北口港区的市中心连接市中心的封口。 这需要引入分支将分支连接到Cuthindingen Tunnels。 通过在Oster Sogade的大量修改以及哈夫霍尔森的新轴的引入来进行分叉。 本文概述了这些变化引入的工程和后勤挑战,从围绕运行铁路线附近的现有堆叠隧道的建设来施加35米深轴,以如何关闭轴的闭合隧道对隧道设施和整体进行影响。 时间表,加上许多其他问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号