首页> 外文期刊>Pramana >Improvement in performance and operational experience of 14 UD Pelletron Accelerator Facility, BARC-TIFR
【24h】

Improvement in performance and operational experience of 14 UD Pelletron Accelerator Facility, BARC-TIFR

机译:改善了14 UD Pelletron加速器设施BARC-TIFR的性能和操作经验

获取原文
获取原文并翻译 | 示例
       

摘要

14 UD Pelletron Accelerator Facility at Mumbai has been operational since 1989. The project MEHIA (medium energy heavy ion accelerator) started in 1982 and was formally inaugurated on 30th December 1988. Since then the accelerator has been working round the clock. Improvement in accelerator performance and operational experience are described.
机译:14孟买的UD Pelletron加速器设施自1989年开始运营。MEHIA(中能重离子加速器)项目于1982年启动,并于1988年12月30日正式启动。此后加速器一直在昼夜运转。描述了加速器性能和操作经验的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号