This paper reports on the construction of a 31.4-to 33.1-m-deep subway station in Shanghai, China. This underground transit project was complicated further by the in situ hydrogeological condition, congested construction environment, and additional side-by-side deep excavations for other underground facilities. To protect the urban environment, challenges of this project, including potential risks, were evaluated in advance, and corresponding countermeasures to cope with potential risks were considered in the design and construction. To achieve the best project performance and verify design and construction considerations, a long-term field instrumentation program that lasted from May 2012 to April 2016 was implemented to monitor performance of the subway station pit and the adjacent ground and superstructures . Field data revealed that displacements of earth-retaining structures and the ground were within the local deformation control criteria. With the exception of a local leaking accident, no through-wall-seepage flow, piping, sand boiling, soil flow, rupture of pit base, or hydraulic uplifting of basal soils took place during the construction. The monitored cumulative settlements of adjacent buildings exceeded the specified criterion, but most buildings underwent only rigid tilt settlements and were rarely damaged. Experiences and lessons learned from this project will be useful for future design and construction of deeply buried infrastructures in densely populated cities.
机译:本文报道了中国上海一个31.4至33.1米深的地铁站的建设情况。由于地下水文地质条件,拥挤的施工环境以及其他地下设施的额外的并排深基坑开挖,该地下运输项目变得更加复杂。为了保护城市环境,事先评估了该项目的挑战,包括潜在风险,并在设计和施工中考虑了应对潜在风险的相应对策。为了获得最佳的项目绩效并验证设计和施工考虑,实施了一项从2012年5月至2016年4月的长期现场仪表计划,以监测地铁站坑以及邻近地面和上层建筑的性能。现场数据表明,挡土结构和地面的位移均在局部变形控制标准之内。除局部泄漏事故外,在施工过程中未发生贯穿墙的渗流,管道,砂土沸腾,土壤流,基坑破裂或基础土壤的水力抬升。监视的相邻建筑物的累积沉降超过了指定标准,但是大多数建筑物仅经历了刚性倾斜沉降,很少受到损坏。从该项目中汲取的经验教训将有助于将来在人口稠密的城市中设计和建造深埋的基础设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号