首页> 外文期刊>IEEE Transactions on Power Systems >A Multiperiod Energy Acquisition Model for a Distribution Company With Distributed Generation and Interruptible Load
【24h】

A Multiperiod Energy Acquisition Model for a Distribution Company With Distributed Generation and Interruptible Load

机译:具有分布式发电和可中断负荷的配电公司的多周期能量获取模型

获取原文
获取原文并翻译 | 示例

摘要

This paper presents a multiperiod energy acquisition model for a distribution company (Disco) with distributed generation (DG) and interruptible load (IL) in a day-ahead electricity market. Assuming that cost information for individual generation companies (Gencos) and Discos is known, the Disco''s energy acquisition strategy is modeled as a bilevel optimization problem with the upper subproblem representing individual Discos and the lower subproblem representing the independent system operator (ISO). The upper subproblem maximizes individual Discos'' revenues. The lower subproblem simulates the ISO''s market clearing problem that minimizes generation costs and compensation costs for interrupting load. The bilevel problem is solved by a nonlinear complementarity method. An 8-bus system is employed to illustrate the proposed model and algorithm. In particular, the roles of DGs and ILs to alleviate congestion are analyzed
机译:本文介绍了在日前电力市场中具有分布式发电(DG)和可中断负荷(IL)的配电公司(Disco)的多周期能量获取模型。假设了解各个发电公司(Gencos)和Discos的成本信息,则将Disco的能源获取策略建模为一个双层优化问题,其中上层子问题代表各个Discos,下层子问题代表独立系统运营商(ISO) 。较高的子问题可以使单个Discos的收入最大化。较低的子问题模拟了ISO的市场清算问题,该问题使发电成本和中断负载的补偿成本最小化。通过非线性互补方法解决了双层问题。采用8总线系统来说明所提出的模型和算法。特别地,分析了DG和IL在缓解拥塞方面的作用

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号