首页> 外文期刊>Power Systems, IEEE Transactions on >Fuzzy Stochastic Programming Method: Capacitor Planning in Distribution Systems With Wind Generators
【24h】

Fuzzy Stochastic Programming Method: Capacitor Planning in Distribution Systems With Wind Generators

机译:模糊随机规划方法:带有风力发电机的配电系统中的电容器规划

获取原文
获取原文并翻译 | 示例

摘要

Capacitor planning in a distribution system (DS) must account for forecasted load and planned wind generators (WGs). In some DSs with large penetration, WGs support a significant part of the total load on an average and the power flow reverses to the substation during high-wind-low-load conditions. With annual forecasts of peak loads and generations being probabilistic in nature with differing probability distribution functions, their proper representation in a capacitor planning exercise is imperative.
机译:配电系统(DS)中的电容器规划必须考虑预测的负荷和规划的风力发电机(WG)。在某些具有大穿透力的DS中,WG平均支持很大一部分总负载,并且在高风-低负载条件下,功率流会反向转换为变电站。由于峰值负荷和发电量的年度预测本质上是概率性的,具有不同的概率分布函数,因此在电容器规划中必须正确地表示出来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号